Saturday working at Edge London Bridge 7, 14 and 21 June

Contractor Mace, at the Edge London Bridge site on St Thomas Street has given notice that work will be underway there over the next three Saturdays to dismantle and remove the jump form rig (the box at the top of the tower). This requires extensive exclusion zones for safety and so must be undertaken when most personnel are off site.  Work will take place on Saturdays 9-2pm. The schedule may change if there are high winds.