26 Mar Closure of St Thomas Street weekend 27-29 March
Posted at 09:04h
in All
The TC2 Tower Crane on the EDGE construction site on St Thomas Street is to be removed this coming weekend 27-29 March, and the street will be closed to traffic and pedestrians for the purpose. A 450t mobile crane will be positioned outside London Bridge Station loading bay exit (opposite the Edge site) to assist. The work is expected to be create minimal noise levels. Mace, the contractor, will be aiming to complete the works safely and as soon as possible.
The road closure will be in effect from 11pm Friday 27 March – 8pm Sunday 29 March. To contact the Mace team, call Harry Bhamber on 07715 357 460.